![]() |
37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
| Attributes | |
| ACN | 94077 |
| Time | |
| Date | 198809 |
| Day | Sun |
| Local Time Of Day | 0601 To 1200 |
| Place | |
| Locale Reference | atc facility : vps |
| State Reference | FL |
| Altitude | msl bound lower : 4000 msl bound upper : 6000 |
| Environment | |
| Flight Conditions | VMC |
| Light | Daylight |
| Aircraft 1 | |
| Controlling Facilities | artcc : zjx tracon : pns tracon : vps |
| Operator | other |
| Make Model Name | Military Trainer |
| Flight Phase | descent other |
| Flight Plan | IFR |
| Person 1 | |
| Affiliation | government : faa |
| Function | controller : approach |
| Qualification | controller : radar |
| ASRS Report | 94077 |
| Person 2 | |
| Affiliation | government : faa |
| Function | controller : radar |
| Qualification | controller : radar |
| Events | |
| Anomaly | non adherence : published procedure other anomaly other |
| Independent Detector | other controllera |
| Resolutory Action | none taken : unable none taken : anomaly accepted |
| Consequence | faa : investigated |
| Supplementary | |
| Primary Problem | ATC Human Performance |
| Air Traffic Incident | Operational Deviation |
Narrative:
MTR X was handed off to me, I was working the north whiting arrival sector (U). There was a coordination agreement between pensacola and jacksonville center that MTR aircraft recovering to nse were my control for descent on initial contact. On initial contact, MTR X was descended to 4000' and his route of flight crossed just over eglin (ups) airspace west/O a pointout. The aircraft later cancelled IFR and landed VFR at south whiting. There were no other aircraft involved. No evasive action was taken. I believe this error occurred because effective communication and pointout procedure were not followed.
Original NASA ASRS Text
Title: MIL TRAINER PASSED THROUGH VPS AIRSPACE WITHOUT POINTOUT OR HANDOFF. OPERATIONAL DEVIATION.
Narrative: MTR X WAS HANDED OFF TO ME, I WAS WORKING THE N WHITING ARR SECTOR (U). THERE WAS A COORD AGREEMENT BTWN PENSACOLA AND JACKSONVILLE CENTER THAT MTR ACFT RECOVERING TO NSE WERE MY CONTROL FOR DSCNT ON INITIAL CONTACT. ON INITIAL CONTACT, MTR X WAS DSNDED TO 4000' AND HIS ROUTE OF FLT CROSSED JUST OVER EGLIN (UPS) AIRSPACE W/O A POINTOUT. THE ACFT LATER CANCELLED IFR AND LANDED VFR AT S WHITING. THERE WERE NO OTHER ACFT INVOLVED. NO EVASIVE ACTION WAS TAKEN. I BELIEVE THIS ERROR OCCURRED BECAUSE EFFECTIVE COM AND POINTOUT PROC WERE NOT FOLLOWED.
Data retrieved from NASA's ASRS site as of August 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.