![]() |
37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
| Attributes | |
| ACN | 387561 |
| Time | |
| Date | 199712 |
| Day | Wed |
| Local Time Of Day | 1201 To 1800 |
| Place | |
| Locale Reference | airport : frg |
| State Reference | NY |
| Altitude | agl bound lower : 0 agl bound upper : 0 |
| Environment | |
| Flight Conditions | VMC |
| Light | Daylight |
| Aircraft 1 | |
| Controlling Facilities | tracon : sbn |
| Operator | general aviation : instructional |
| Make Model Name | Any Unknown or Unlisted Aircraft Manufacturer |
| Operating Under FAR Part | Part 91 |
| Flight Phase | ground other : taxi |
| Flight Plan | None |
| Aircraft 2 | |
| Make Model Name | PA-28 Cherokee/Archer II/Dakota/Pillan/Warrior |
| Operating Under FAR Part | Part 91 |
| Flight Phase | ground : parked |
| Flight Plan | None |
| Person 1 | |
| Affiliation | Other |
| Function | instruction : instructor |
| Qualification | pilot : cfi pilot : instrument |
| Experience | flight time total : 830 |
| ASRS Report | 387561 |
| Person 2 | |
| Affiliation | Other |
| Function | instruction : trainee |
| Qualification | pilot : student |
| Events | |
| Anomaly | conflict : ground critical other anomaly other |
| Independent Detector | other flight crewa |
| Resolutory Action | none taken : detected after the fact |
| Consequence | other |
| Supplementary | |
| Primary Problem | Flight Crew Human Performance |
| Air Traffic Incident | Pilot Deviation |
Narrative:
I was taxiing back (and running late) to the flight school when the katana right wing light package, ie, strobe position light and navigation light, struck piper warrior propeller cone. No damage to the piper. Katana right wing light package was damaged and position light cover broke. (Light package and position light cover repaired by an a&P 2 hours later.)
Original NASA ASRS Text
Title: KATANA DA20 ACFT ON TRAINING WITH INSTRUCTOR PLT TAXIING IN, BEHIND SCHEDULE, CLIPPED PARKED PA28 PROP CONE CAUSING DAMAGE TO RPTR ACFT WINGTIP LIGHT PACKAGE.
Narrative: I WAS TAXIING BACK (AND RUNNING LATE) TO THE FLT SCHOOL WHEN THE KATANA R WING LIGHT PACKAGE, IE, STROBE POS LIGHT AND NAV LIGHT, STRUCK PIPER WARRIOR PROP CONE. NO DAMAGE TO THE PIPER. KATANA R WING LIGHT PACKAGE WAS DAMAGED AND POS LIGHT COVER BROKE. (LIGHT PACKAGE AND POS LIGHT COVER REPAIRED BY AN A&P 2 HRS LATER.)
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.