37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
| Attributes | |
| ACN | 662927 |
| Time | |
| Date | 200506 |
| Local Time Of Day | 0001 To 0600 |
| Place | |
| Locale Reference | airport : zzz.airport |
| State Reference | US |
| Altitude | agl single value : 0 |
| Aircraft 1 | |
| Operator | common carrier : air carrier |
| Make Model Name | B737-300 |
| Operating Under FAR Part | Part 121 |
| Flight Phase | ground : maintenance |
| Flight Plan | IFR |
| Person 1 | |
| Affiliation | company : air carrier |
| Function | maintenance : technician |
| Qualification | technician : powerplant technician : airframe |
| Experience | maintenance lead technician : 30 |
| ASRS Report | 662927 |
| Person 2 | |
| Affiliation | company : air carrier |
| Function | flight crew : captain oversight : pic |
| Events | |
| Anomaly | aircraft equipment problem : critical maintenance problem : improper maintenance maintenance problem : improper documentation non adherence : far non adherence : published procedure |
| Independent Detector | aircraft equipment other aircraft equipment : efis - radar range marks wrong other flight crewa other flight crewb |
| Resolutory Action | none taken : detected after the fact |
| Consequence | other |
| Factors | |
| Maintenance | contributing factor : work cards performance deficiency : non compliance with legal requirements performance deficiency : testing performance deficiency : logbook entry performance deficiency : inspection |
| Supplementary | |
| Problem Areas | Aircraft Chart Or Publication Maintenance Human Performance |
| Primary Problem | Maintenance Human Performance |
Narrative:
Aircraft X arrived ZZZ with captain's/first officer's HSI display CRT incorrect format. Troubleshooting found change order authority/authorized accomplished by vendor had left mis-wired bench plug on symbol generators. Both vendors failed to accomplish change order authority/authorized per coa. Vendor signed off change order authority/authorized operations check as normal; however; it was incorrectly operations checked. Vendor read change order authority/authorized instructions backwards. Should have wired bench plug left or right. Vendor wired bench plug right to left. Callback conversation with reporter revealed the following information: the bench plugs on the symbol generators were wired incorrectly. Wiring was corrected at the bench plugs. Checks ok.
Original NASA ASRS Text
Title: A B737-300 HAD A CHANGE ORDER AUTH ACCOMPLISHED BY A CONTRACT MAINT FACILITY. BOTH HSI CRT DISPLAYS HAD EXTRA RADAR RANGE LINES ADDED AND WAS WRONG CONFIGN.
Narrative: ACFT X ARRIVED ZZZ WITH CAPT'S/FO'S HSI DISPLAY CRT INCORRECT FORMAT. TROUBLESHOOTING FOUND CHANGE ORDER AUTH ACCOMPLISHED BY VENDOR HAD L MIS-WIRED BENCH PLUG ON SYMBOL GENERATORS. BOTH VENDORS FAILED TO ACCOMPLISH CHANGE ORDER AUTH PER COA. VENDOR SIGNED OFF CHANGE ORDER AUTH OPS CHK AS NORMAL; HOWEVER; IT WAS INCORRECTLY OPS CHKED. VENDOR READ CHANGE ORDER AUTH INSTRUCTIONS BACKWARDS. SHOULD HAVE WIRED BENCH PLUG L OR R. VENDOR WIRED BENCH PLUG R TO L. CALLBACK CONVERSATION WITH RPTR REVEALED THE FOLLOWING INFO: THE BENCH PLUGS ON THE SYMBOL GENERATORS WERE WIRED INCORRECTLY. WIRING WAS CORRECTED AT THE BENCH PLUGS. CHKS OK.