![]()  | 
            37000 Feet | Browse and search NASA's Aviation Safety Reporting System  | 
            
                
  | 
        
| Attributes | |
| ACN | 442330 | 
| Time | |
| Date | 199907 | 
| Day | Wed | 
| Local Time Of Day | 0601 To 1200 | 
| Place | |
| Locale Reference | navaid : sbi.vor | 
| State Reference | TX | 
| Altitude | msl single value : 8000 | 
| Environment | |
| Flight Conditions | VMC | 
| Light | Daylight | 
| Aircraft 1 | |
| Controlling Facilities | artcc : zhu.artcc | 
| Operator | common carrier : air carrier | 
| Make Model Name | Medium Transport, High Wing, 2 Turboprop Eng | 
| Operating Under FAR Part | Part 121 | 
| Navigation In Use | other vortac | 
| Flight Plan | IFR | 
| Person 1 | |
| Affiliation | company : air carrier | 
| Function | flight crew : captain oversight : pic  | 
| Qualification | pilot : multi engine pilot : atp pilot : commercial  | 
| Experience | flight time last 90 days : 140 flight time total : 3800 flight time type : 2200  | 
| ASRS Report | 442330 | 
| Person 2 | |
| Affiliation | company : air carrier | 
| Function | flight crew : first officer | 
| Qualification | pilot : multi engine pilot : commercial pilot : instrument  | 
| Events | |
| Anomaly | altitude deviation : crossing restriction not met non adherence : clearance  | 
| Independent Detector | other controllera | 
| Resolutory Action | none taken : insufficient time | 
| Consequence | Other | 
| Supplementary | |
| Problem Areas | Flight Crew Human Performance | 
| Primary Problem | Flight Crew Human Performance | 
| Air Traffic Incident | Pilot Deviation | 
Narrative:
Was approximately 50 DME east of sbi VOR, center told me to cross 20 mi west of sbi at 8000 ft. I started the descent at 40 DME east of sbi expecting to make the restr. At 10 DME west of sbi center asked if I was going to make the restr. At that point I realized my error. Even though I dialed 8000 ft in the autoplt, I was calculating for a 10000 ft altitude. I missed the restr by about 4 mi. I believe my mistake to be the result of fatigue. The day before was a long day with thunderstorms and WX delays. The rest period was reduced to 8 hours with a long drive to and from the hotel. My estimated actual sleep time was 5 hours.
Original NASA ASRS Text
Title: MDT CREW DID NOT COMPLY WITH XING RESTR.
Narrative: WAS APPROX 50 DME E OF SBI VOR, CTR TOLD ME TO CROSS 20 MI W OF SBI AT 8000 FT. I STARTED THE DSCNT AT 40 DME E OF SBI EXPECTING TO MAKE THE RESTR. AT 10 DME W OF SBI CTR ASKED IF I WAS GOING TO MAKE THE RESTR. AT THAT POINT I REALIZED MY ERROR. EVEN THOUGH I DIALED 8000 FT IN THE AUTOPLT, I WAS CALCULATING FOR A 10000 FT ALT. I MISSED THE RESTR BY ABOUT 4 MI. I BELIEVE MY MISTAKE TO BE THE RESULT OF FATIGUE. THE DAY BEFORE WAS A LONG DAY WITH TSTMS AND WX DELAYS. THE REST PERIOD WAS REDUCED TO 8 HRS WITH A LONG DRIVE TO AND FROM THE HOTEL. MY ESTIMATED ACTUAL SLEEP TIME WAS 5 HRS.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.