| Attributes | |
| ACN | 395625 |
| Time | |
| Date | 199803 |
| Day | Tue |
| Local Time Of Day | 1801 To 2400 |
| Place | |
| Locale Reference | airport : zzz |
| State Reference | US |
| Altitude | agl bound lower : 0 agl bound upper : 0 |
| Environment | |
| Light | Night |
| Aircraft 1 | |
| Operator | common carrier : air carrier |
| Make Model Name | B757-200 |
| Operating Under FAR Part | Part 121 |
| Navigation In Use | Other Other |
| Flight Phase | other |
| Flight Plan | None |
| Person 1 | |
| Affiliation | company : air carrier |
| Function | other personnel other |
| Qualification | other other : other |
| ASRS Report | 395625 |
| Person 2 | |
| Affiliation | company : air carrier |
| Function | other personnel other |
| Qualification | other other : other |
| Events | |
| Anomaly | aircraft equipment problem : less severe non adherence : far non adherence : published procedure other anomaly other |
| Independent Detector | other other : unspecified |
| Resolutory Action | none taken : detected after the fact |
| Consequence | Other |
| Supplementary | |
| Primary Problem | Aircraft |
| Air Traffic Incident | other |
Narrative:
On mar/xx/98 and mar/xy/98 I was the lead amt assigned to aircraft xyz and aircraft XXX. Aircraft XXX was a B-1 check which required my attention in assigning manpwr, insuring work completion and monitoring paperwork. I had assigned 2 mechanics to work the variable stator vane rig on aircraft xyz. On mar/xy/98, after a power assurance run on aircraft xyz, we were clearing up the paperwork on xyz when a mechanic noticed that there were a couple of missing write-ups. There were no open write-ups in the computer and it was assumed that we were working with a paperless airplane. I redid the envelope to include the task oriented document job card and disposed of the old envelope. Later, I found out that the paperwork was being monitored by the FAA. We received a turnover on the job which involved only a monologue of what had been changed the previous shift, a boroscope inspection, and that maintenance control wanted a rerig of the variable stator vanes based on that turnover and the training I had received on a paperless airplane. Given past practices at air carrier, I felt what I did was acceptable practice regarding a paperless airplane.
Original NASA ASRS Text
Title: A B757-200 HAD WORK ACCOMPLISHED THAT WAS NOT DOCUMENTED UNTIL THE JOB WAS COMPLETED.
Narrative: ON MAR/XX/98 AND MAR/XY/98 I WAS THE LEAD AMT ASSIGNED TO ACFT XYZ AND ACFT XXX. ACFT XXX WAS A B-1 CHK WHICH REQUIRED MY ATTN IN ASSIGNING MANPWR, INSURING WORK COMPLETION AND MONITORING PAPERWORK. I HAD ASSIGNED 2 MECHS TO WORK THE VARIABLE STATOR VANE RIG ON ACFT XYZ. ON MAR/XY/98, AFTER A PWR ASSURANCE RUN ON ACFT XYZ, WE WERE CLRING UP THE PAPERWORK ON XYZ WHEN A MECH NOTICED THAT THERE WERE A COUPLE OF MISSING WRITE-UPS. THERE WERE NO OPEN WRITE-UPS IN THE COMPUTER AND IT WAS ASSUMED THAT WE WERE WORKING WITH A PAPERLESS AIRPLANE. I REDID THE ENVELOPE TO INCLUDE THE TASK ORIENTED DOCUMENT JOB CARD AND DISPOSED OF THE OLD ENVELOPE. LATER, I FOUND OUT THAT THE PAPERWORK WAS BEING MONITORED BY THE FAA. WE RECEIVED A TURNOVER ON THE JOB WHICH INVOLVED ONLY A MONOLOGUE OF WHAT HAD BEEN CHANGED THE PREVIOUS SHIFT, A BOROSCOPE INSPECTION, AND THAT MAINT CTL WANTED A RERIG OF THE VARIABLE STATOR VANES BASED ON THAT TURNOVER AND THE TRAINING I HAD RECEIVED ON A PAPERLESS AIRPLANE. GIVEN PAST PRACTICES AT ACR, I FELT WHAT I DID WAS ACCEPTABLE PRACTICE REGARDING A PAPERLESS AIRPLANE.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.