![]() |
37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
| Attributes | |
| ACN | 776295 |
| Time | |
| Date | 200802 |
| Place | |
| Locale Reference | airport : sjc.airport |
| State Reference | CA |
| Environment | |
| Flight Conditions | Mixed |
| Light | Daylight |
| Aircraft 1 | |
| Operator | common carrier : air carrier |
| Make Model Name | B737 Undifferentiated or Other Model |
| Operating Under FAR Part | Part 121 |
| Navigation In Use | other |
| Flight Phase | climbout : initial |
| Route In Use | departure sid : danv |
| Flight Plan | IFR |
| Person 1 | |
| Affiliation | government : faa |
| Function | controller : local |
| Qualification | controller : radar |
| ASRS Report | 776295 |
| Events | |
| Anomaly | non adherence : clearance other anomaly other |
| Independent Detector | other controllera |
| Resolutory Action | none taken : anomaly accepted |
| Supplementary | |
| Problem Areas | FAA Company |
| Primary Problem | Ambiguous |
Narrative:
Air carrier X began receiving pre departure clearance clearance out of san jose. Due to no/poor training on how to read pre departure clearance; we experienced at least 2 pltdevs due to aircraft flying incorrect SID. When departing runway 12 we have 2 different sids that can be assigned altam/danville; depending on flow at sfo. This is not normally a problem when departing runway 30 but it could be if aircraft files sjc 9; however; computer center route assigned loupe departure. The added responsibility placed on controller to ensure aircraft receives correct routing because air carrier X failed to train its pilots is unfortunate.
Original NASA ASRS Text
Title: SJC CTLR EXPRESSED CONCERN REGARDING LACK OF TRAINING RELATING TO THE IMPLEMENTATION OF PDC CLRNCS.
Narrative: ACR X BEGAN RECEIVING PDC CLRNC OUT OF SAN JOSE. DUE TO NO/POOR TRAINING ON HOW TO READ PDC; WE EXPERIENCED AT LEAST 2 PLTDEVS DUE TO ACFT FLYING INCORRECT SID. WHEN DEPARTING RWY 12 WE HAVE 2 DIFFERENT SIDS THAT CAN BE ASSIGNED ALTAM/DANVILLE; DEPENDING ON FLOW AT SFO. THIS IS NOT NORMALLY A PROB WHEN DEPARTING RWY 30 BUT IT COULD BE IF ACFT FILES SJC 9; HOWEVER; COMPUTER CTR RTE ASSIGNED LOUPE DEP. THE ADDED RESPONSIBILITY PLACED ON CTLR TO ENSURE ACFT RECEIVES CORRECT ROUTING BECAUSE ACR X FAILED TO TRAIN ITS PLTS IS UNFORTUNATE.
Data retrieved from NASA's ASRS site as of May 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.