![]() |
37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
| Attributes | |
| ACN | 565500 |
| Time | |
| Date | 200211 |
| Day | Thu |
| Local Time Of Day | 0601 To 1200 |
| Place | |
| Locale Reference | airport : cew.airport |
| State Reference | FL |
| Altitude | msl bound lower : 10000 msl bound upper : 12000 |
| Environment | |
| Flight Conditions | VMC |
| Light | Daylight |
| Aircraft 1 | |
| Controlling Facilities | artcc : zjx.artcc |
| Operator | other |
| Make Model Name | Hercules (C-130) |
| Operating Under FAR Part | Part 91 |
| Flight Phase | climbout : intermediate altitude |
| Flight Plan | IFR |
| Aircraft 2 | |
| Controlling Facilities | artcc : zjx.artcc |
| Make Model Name | Any Unknown or Unlisted Aircraft Manufacturer |
| Person 1 | |
| Affiliation | government : faa |
| Function | controller : radar |
| Qualification | controller : radar |
| Experience | controller non radar : 13 controller radar : 10 flight time total : 80 |
| ASRS Report | 565500 |
| Person 2 | |
| Affiliation | government : faa |
| Function | controller : departure |
| Events | |
| Anomaly | airspace violation : entry conflict : airborne less severe non adherence : published procedure non adherence : required legal separation other anomaly other |
| Independent Detector | other controllera other controllerb other flight crewa other flight crewb |
| Resolutory Action | controller : issued new clearance |
| Supplementary | |
| Problem Areas | ATC Human Performance |
| Primary Problem | ATC Human Performance |
| Air Traffic Incident | Inter Facility Coordination Failure |
Narrative:
C130 departed hrt. Vps (eglin) approach called to release aircraft X for on course. I did as instructed, and climbed aircraft to 12000 ft. The aircraft failed to climb above the adjacent facility boundary, and a pointout was effected while coordinating maneuvers to avoid conflicting traffic.
Original NASA ASRS Text
Title: ZJX ARTCC RADAR CTLR FAILED TO CLB A MIL C130 ABOVE ADJACENT FACILITY'S AIRSPACE.
Narrative: C130 DEPARTED HRT. VPS (EGLIN) APCH CALLED TO RELEASE ACFT X FOR ON COURSE. I DID AS INSTRUCTED, AND CLBED ACFT TO 12000 FT. THE ACFT FAILED TO CLB ABOVE THE ADJACENT FACILITY BOUNDARY, AND A POINTOUT WAS EFFECTED WHILE COORDINATING MANEUVERS TO AVOID CONFLICTING TFC.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.