Narrative:

On ksino arrival expected to land runway 25L. Controller changed runway to runway 19L. Input new runway into FMS but airplane did not slow to 210 KTS at cutax intersection. Speed stayed at 250 KTS. Controllers should bear in mind that whenever runway changes are made while on a managed arrival, some potential exists for losing data from database of FMS.

Google
 

Original NASA ASRS Text

Title: CHANGING THE KSINO RNAV 1 ARR AT LAS, NV, TO THE RWY 19 ROUTING FROM THE PLANNED RWY 25 ROUTING LEADS TO NON COMPLIANCE WITH THE 210 KT SPD RESTR AT CUTAX INTXN.

Narrative: ON KSINO ARR EXPECTED TO LAND RWY 25L. CTLR CHANGED RWY TO RWY 19L. INPUT NEW RWY INTO FMS BUT AIRPLANE DID NOT SLOW TO 210 KTS AT CUTAX INTXN. SPD STAYED AT 250 KTS. CTLRS SHOULD BEAR IN MIND THAT WHENEVER RWY CHANGES ARE MADE WHILE ON A MANAGED ARR, SOME POTENTIAL EXISTS FOR LOSING DATA FROM DATABASE OF FMS.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.