37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
| Attributes | |
| ACN | 530080 |
| Time | |
| Date | 200105 |
| Day | Thu |
| Local Time Of Day | 0601 To 1200 |
| Place | |
| Locale Reference | airport : zzz.airport |
| State Reference | US |
| Altitude | agl single value : 0 |
| Environment | |
| Light | Daylight |
| Aircraft 1 | |
| Operator | common carrier : air carrier |
| Make Model Name | B737-300 |
| Operating Under FAR Part | Part 121 |
| Flight Phase | ground : maintenance |
| Person 1 | |
| Affiliation | company : air carrier |
| Function | maintenance : inspector |
| Qualification | technician : powerplant technician : airframe technician : inspection authority |
| Experience | maintenance lead technician : 1 maintenance technician : 11 |
| ASRS Report | 530080 |
| Person 2 | |
| Affiliation | company : air carrier |
| Function | maintenance : technician |
| Qualification | technician : powerplant technician : airframe |
| ASRS Report | 530716 |
| Events | |
| Anomaly | aircraft equipment problem : critical maintenance problem : improper maintenance non adherence : far non adherence : published procedure |
| Resolutory Action | none taken : detected after the fact |
| Consequence | other other |
| Factors | |
| Maintenance | contributing factor : schedule pressure performance deficiency : installation performance deficiency : inspection performance deficiency : scheduled maintenance |
| Supplementary | |
| Problem Areas | Aircraft Maintenance Human Performance |
| Primary Problem | Maintenance Human Performance |
Narrative:
On oct/thu/01, aircraft was in ZZZ for 'C' check. Inspector XXX wrote up 5 cables for corrosion. At the end of late night shift, I was asked to work 4 hours over and help finish 'C' check. I received nrc (non-routine card) #XXXX 'spoiler system requirements to be rigged also reference YYYY, ZZZZ, WWWW and abcd.' to the best of my knowledge, I verified cable tensions and pick up and lay-down on spoiler panels. I did not check routing of cables because the installation was bought off on above reference nrc's. It was brought to my attention by my supervisor that on day oct/tue/01. Inspector in ZZZ wrote up cables WSA1-2 and WSA2-2 were crossed. Aircraft was in ZZZ for time change on spoiler mixer.
Original NASA ASRS Text
Title: A B737-300 WAS DISPATCHED IN NON COMPLIANCE FROM A SCHEDULED MAINT CHK WITH 2 SPOILER CABLES CROSSED.
Narrative: ON OCT/THU/01, ACFT WAS IN ZZZ FOR 'C' CHK. INSPECTOR XXX WROTE UP 5 CABLES FOR CORROSION. AT THE END OF LATE NIGHT SHIFT, I WAS ASKED TO WORK 4 HRS OVER AND HELP FINISH 'C' CHK. I RECEIVED NRC (NON-ROUTINE CARD) #XXXX 'SPOILER SYS REQUIREMENTS TO BE RIGGED ALSO REF YYYY, ZZZZ, WWWW AND ABCD.' TO THE BEST OF MY KNOWLEDGE, I VERIFIED CABLE TENSIONS AND PICK UP AND LAY-DOWN ON SPOILER PANELS. I DID NOT CHK ROUTING OF CABLES BECAUSE THE INSTALLATION WAS BOUGHT OFF ON ABOVE REF NRC'S. IT WAS BROUGHT TO MY ATTN BY MY SUPVR THAT ON DAY OCT/TUE/01. INSPECTOR IN ZZZ WROTE UP CABLES WSA1-2 AND WSA2-2 WERE CROSSED. ACFT WAS IN ZZZ FOR TIME CHANGE ON SPOILER MIXER.