37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
| Attributes | |
| ACN | 439044 |
| Time | |
| Date | 199906 |
| Day | Sun |
| Local Time Of Day | 1201 To 1800 |
| Place | |
| Locale Reference | airport : zzz.airport |
| State Reference | US |
| Altitude | agl single value : 0 |
| Environment | |
| Light | Daylight |
| Aircraft 1 | |
| Operator | common carrier : air carrier |
| Make Model Name | McDonnell Douglas Undifferentiated or Other Model |
| Operating Under FAR Part | Part 121 |
| Flight Phase | ground : maintenance ground : parked |
| Flight Plan | IFR |
| Person 1 | |
| Affiliation | company : air carrier |
| Function | maintenance : technician |
| Qualification | technician : powerplant technician : airframe |
| Experience | maintenance technician : 9 |
| ASRS Report | 439044 |
| Events | |
| Anomaly | aircraft equipment problem : critical maintenance problem : improper maintenance non adherence : published procedure non adherence : far |
| Resolutory Action | none taken : detected after the fact |
| Consequence | other other other |
| Factors | |
| Maintenance | contributing factor : schedule pressure contributing factor : lighting performance deficiency : installation performance deficiency : non compliance with legal requirements performance deficiency : repair |
| Supplementary | |
| Problem Areas | Maintenance Human Performance Aircraft |
| Primary Problem | Maintenance Human Performance |
Narrative:
On jun/xa/99 approximately AB00 hours, aircraft (air carrier) xyz arrived in ZZZ, missing the #1 main wheel/tire. As of jun/xa, AB00 hours, the wheel assembly had not been located. The aircraft arrived from abc. I was the last mechanic to install the #1 main tire on may/xy/99 approximately BA00 hours. To the best of my knowledge, I had properly installed the aircraft tire to maintenance manual standards.
Original NASA ASRS Text
Title: A DC9-50 ARRIVED AT ZZZ WITH THE L OUTBOARD WHEEL AND TIRE MISSING CAUSED BY ALLEGED IMPROPER INSTALLATION. WHEEL AND TIRE ASSEMBLY REPLACED 8 DAYS PRIOR TO INCIDENT.
Narrative: ON JUN/XA/99 APPROX AB00 HRS, ACFT (ACR) XYZ ARRIVED IN ZZZ, MISSING THE #1 MAIN WHEEL/TIRE. AS OF JUN/XA, AB00 HRS, THE WHEEL ASSEMBLY HAD NOT BEEN LOCATED. THE ACFT ARRIVED FROM ABC. I WAS THE LAST MECH TO INSTALL THE #1 MAIN TIRE ON MAY/XY/99 APPROX BA00 HRS. TO THE BEST OF MY KNOWLEDGE, I HAD PROPERLY INSTALLED THE ACFT TIRE TO MAINT MANUAL STANDARDS.