Narrative:

Destination and alternate WX were forecast to be good. On arrival at oak, an approach was initiated to runway 29. Prior to the final approach segment, the WX deteriorated below CAT ii minimums and a missed approach was accomplished. We had approximately 20 mins of extra fuel and entered a holding pattern at oak. WX was checked at our alternate and other possible diversion airports. Sfo ATIS continued to report 2 1/2 and 500 ft ceiling. When fuel reached alternate plus reserve, we departed hold for an approach to sfo runway 28L (runway 28R -- the CAT ii and CAT III runway was closed). The WX began to deteriorate and, before we reached the final approach segment, dropped below landing minimums. (2400 ft RVR for runway 28L.) a missed approach was accomplished. During vectoring, WX was checked continually and it was determined that the only above minimum airports were fresno and reno. Both would involve landing with less than 2000 pounds. I deemed it safer to initiate a second approach at sfo (now 1600 ft RVR). An uneventful approach and landing were made at sfo to runway 28L. I believe the problem was due to scheduling alternate airports that are subject to the same WX patterns, ie, fog as the destination.

Google
 

Original NASA ASRS Text

Title: AN ACR B727 FREIGHTER LANDED BELOW MINIMUMS BECAUSE THE FUEL REQUIRED WAS NOT ABOARD.

Narrative: DEST AND ALTERNATE WX WERE FORECAST TO BE GOOD. ON ARR AT OAK, AN APCH WAS INITIATED TO RWY 29. PRIOR TO THE FINAL APCH SEGMENT, THE WX DETERIORATED BELOW CAT II MINIMUMS AND A MISSED APCH WAS ACCOMPLISHED. WE HAD APPROX 20 MINS OF EXTRA FUEL AND ENTERED A HOLDING PATTERN AT OAK. WX WAS CHKED AT OUR ALTERNATE AND OTHER POSSIBLE DIVERSION ARPTS. SFO ATIS CONTINUED TO RPT 2 1/2 AND 500 FT CEILING. WHEN FUEL REACHED ALTERNATE PLUS RESERVE, WE DEPARTED HOLD FOR AN APCH TO SFO RWY 28L (RWY 28R -- THE CAT II AND CAT III RWY WAS CLOSED). THE WX BEGAN TO DETERIORATE AND, BEFORE WE REACHED THE FINAL APCH SEGMENT, DROPPED BELOW LNDG MINIMUMS. (2400 FT RVR FOR RWY 28L.) A MISSED APCH WAS ACCOMPLISHED. DURING VECTORING, WX WAS CHKED CONTINUALLY AND IT WAS DETERMINED THAT THE ONLY ABOVE MINIMUM ARPTS WERE FRESNO AND RENO. BOTH WOULD INVOLVE LNDG WITH LESS THAN 2000 LBS. I DEEMED IT SAFER TO INITIATE A SECOND APCH AT SFO (NOW 1600 FT RVR). AN UNEVENTFUL APCH AND LNDG WERE MADE AT SFO TO RWY 28L. I BELIEVE THE PROB WAS DUE TO SCHEDULING ALTERNATE ARPTS THAT ARE SUBJECT TO THE SAME WX PATTERNS, IE, FOG AS THE DEST.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.