![]()  | 
            37000 Feet | Browse and search NASA's Aviation Safety Reporting System  | 
            
                
  | 
        
| Attributes | |
| ACN | 178394 | 
| Time | |
| Date | 199105 | 
| Day | Wed | 
| Local Time Of Day | 1801 To 2400 | 
| Place | |
| Locale Reference | airport : gri | 
| State Reference | NE | 
| Altitude | agl bound lower : 0 agl bound upper : 0  | 
| Environment | |
| Flight Conditions | IMC | 
| Aircraft 1 | |
| Controlling Facilities | tower : clt | 
| Operator | common carrier : air carrier | 
| Make Model Name | Small Transport, Low Wing, 2 Turboprop Eng | 
| Flight Phase | ground : preflight other  | 
| Flight Plan | IFR | 
| Person 1 | |
| Affiliation | company : air carrier | 
| Function | flight crew : captain oversight : pic  | 
| Qualification | pilot : atp | 
| Experience | flight time last 90 days : 268 flight time total : 3200 flight time type : 685  | 
| ASRS Report | 178399 | 
| Person 2 | |
| Affiliation | company : air carrier | 
| Function | other personnel other oversight : supervisor  | 
| Qualification | other other : other pilot : atp  | 
| Events | |
| Anomaly | non adherence : far non adherence other  | 
| Independent Detector | other other : unspecified | 
| Resolutory Action | none taken : detected after the fact | 
| Consequence | Other | 
| Supplementary | |
| Air Traffic Incident | Pilot Deviation | 
Narrative:
Original 135.295 chkride was passed 4/90. Therefore, next 135.295 was due in 10/90. On 9/90 passed a 135.295 ride in a different type aircraft of same category and class. The ride in 9/90 fell into the grace month provisions of 135.301. It was determined that next 135.295 would be due in 4/91, or 6 months after due date of previous 135.295 check since ride on 9/90 was in the early grace month. Next 135.295 ride was not done until 5/91. I thought this was legal as it was the late grace month of the original 135.295 due date. Company director of training informed me that flts in 5/91 were illegal because the 135.295 chkride in 9/90 reset the due date schedule.
Original NASA ASRS Text
Title: COMMUTER PLT FLIES PAST CHECKRIDE VALIDATION PERIOD.
Narrative: ORIGINAL 135.295 CHKRIDE WAS PASSED 4/90. THEREFORE, NEXT 135.295 WAS DUE IN 10/90. ON 9/90 PASSED A 135.295 RIDE IN A DIFFERENT TYPE ACFT OF SAME CATEGORY AND CLASS. THE RIDE IN 9/90 FELL INTO THE GRACE MONTH PROVISIONS OF 135.301. IT WAS DETERMINED THAT NEXT 135.295 WOULD BE DUE IN 4/91, OR 6 MONTHS AFTER DUE DATE OF PREVIOUS 135.295 CHK SINCE RIDE ON 9/90 WAS IN THE EARLY GRACE MONTH. NEXT 135.295 RIDE WAS NOT DONE UNTIL 5/91. I THOUGHT THIS WAS LEGAL AS IT WAS THE LATE GRACE MONTH OF THE ORIGINAL 135.295 DUE DATE. COMPANY DIRECTOR OF TRNING INFORMED ME THAT FLTS IN 5/91 WERE ILLEGAL BECAUSE THE 135.295 CHKRIDE IN 9/90 RESET THE DUE DATE SCHEDULE.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.