| Attributes | |
| ACN | 600817 | 
| Time | |
| Date | 200311 | 
| Day | Fri | 
| Place | |
| Locale Reference | airport : zzz.airport | 
| State Reference | US | 
| Altitude | agl single value : 0 | 
| Aircraft 1 | |
| Controlling Facilities | tower : dfw.tower | 
| Operator | common carrier : air carrier | 
| Make Model Name | MD-80 Series (DC-9-80) Undifferentiated or Other Model | 
| Operating Under FAR Part | Part 121 | 
| Flight Phase | ground : maintenance | 
| Person 1 | |
| Affiliation | company : air carrier | 
| Function | maintenance : technician | 
| Qualification | technician : powerplant technician : airframe  | 
| ASRS Report | 600817 | 
| Person 2 | |
| Affiliation | company : air carrier | 
| Function | maintenance : technician | 
| Qualification | technician : airframe technician : powerplant  | 
| ASRS Report | 600798 | 
| Events | |
| Anomaly | aircraft equipment problem : critical maintenance problem : improper documentation maintenance problem : improper maintenance non adherence : published procedure non adherence : far  | 
| Independent Detector | other other : person 1 | 
| Resolutory Action | none taken : detected after the fact | 
| Consequence | other Other  | 
| Factors | |
| Maintenance | contributing factor : work cards contributing factor : engineering procedure contributing factor : schedule pressure performance deficiency : non compliance with legal requirements performance deficiency : scheduled maintenance performance deficiency : logbook entry  | 
| Supplementary | |
| Problem Areas | Maintenance Human Performance Chart Or Publication Aircraft Company  | 
| Primary Problem | Company | 
| Situations | |
| Publication | AIRWORTHINESS DIRECTIVE | 
Narrative:
I was instructed not to remove insulation on aircraft ducts that weren't accessible and it would be done on later checks. Also engineering change order paperwork would be revised. When neither was accomplished we were in violation of said engineering change order paperwork. Work not accomplished and signed for being accomplished.
Original NASA ASRS Text
Title: MD80 TECHNICIANS WORKING AN ENGINEERING CHANGE ORDER TO REMOVE MYLAR INSULATION FROM PNEUMATIC DUCTING IN THE FORWARD ELECTRONICS COMPARTMENT, RPT MGMNT ORDER TO ONLY REMOVE MYLAR FROM ACCESSIBLE DUCTS ONLY.
Narrative: I WAS INSTRUCTED NOT TO REMOVE INSULATION ON ACFT DUCTS THAT WEREN'T ACCESSIBLE AND IT WOULD BE DONE ON LATER CHKS. ALSO ENGINEERING CHANGE ORDER PAPERWORK WOULD BE REVISED. WHEN NEITHER WAS ACCOMPLISHED WE WERE IN VIOLATION OF SAID ENGINEERING CHANGE ORDER PAPERWORK. WORK NOT ACCOMPLISHED AND SIGNED FOR BEING ACCOMPLISHED.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.