![]() |
37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
| Attributes | |
| ACN | 559972 |
| Time | |
| Date | 200209 |
| Day | Tue |
| Local Time Of Day | 1801 To 2400 |
| Place | |
| Locale Reference | airport : zzz.airport |
| State Reference | US |
| Environment | |
| Light | Night |
| Aircraft 1 | |
| Operator | common carrier : air carrier |
| Make Model Name | B737-300 |
| Operating Under FAR Part | Part 121 |
| Person 1 | |
| Affiliation | company : air carrier |
| Function | maintenance : technician oversight : supervisor |
| ASRS Report | 559972 |
| Person 2 | |
| Affiliation | company : air carrier |
| Function | oversight : coordinator |
| Events | |
| Anomaly | aircraft equipment problem : less severe maintenance problem : improper documentation non adherence : far non adherence : published procedure |
| Resolutory Action | none taken : detected after the fact |
| Consequence | other other |
| Factors | |
| Maintenance | performance deficiency : scheduled maintenance performance deficiency : inspection performance deficiency : non compliance with legal requirements performance deficiency : logbook entry |
| Supplementary | |
| Problem Areas | Maintenance Human Performance Company Aircraft Chart Or Publication |
| Primary Problem | Maintenance Human Performance |
Narrative:
Aircraft terminated in ZZZ on sep/sat/02. The termination was unscheduled. Upon arrival in ZZZ, I contacted planning as to the level check required. I was informed that a pm check would be necessary. I then noted it and issued the check work cards. When the final summary was published it stated a type of check was to be accomplished. When I signed off on the summary final I initialed that a job card was not check worked when a job card was check worked. This led to the check to be overflown.
Original NASA ASRS Text
Title: A B737-300 WAS DISPATCHED IN NON COMPLIANCE WITH A TIME LIMITED ROUTINE CHK OUT OF TIME AND NOT ACCOMPLISHED.
Narrative: ACFT TERMINATED IN ZZZ ON SEP/SAT/02. THE TERMINATION WAS UNSCHEDULED. UPON ARR IN ZZZ, I CONTACTED PLANNING AS TO THE LEVEL CHK REQUIRED. I WAS INFORMED THAT A PM CHK WOULD BE NECESSARY. I THEN NOTED IT AND ISSUED THE CHK WORK CARDS. WHEN THE FINAL SUMMARY WAS PUBLISHED IT STATED A TYPE OF CHK WAS TO BE ACCOMPLISHED. WHEN I SIGNED OFF ON THE SUMMARY FINAL I INITIALED THAT A JOB CARD WAS NOT CHK WORKED WHEN A JOB CARD WAS CHK WORKED. THIS LED TO THE CHK TO BE OVERFLOWN.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.