![]() |
37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
| Attributes | |
| ACN | 520100 |
| Time | |
| Date | 200108 |
| Day | Sat |
| Local Time Of Day | 1801 To 2400 |
| Place | |
| Locale Reference | airport : dca.airport |
| State Reference | DC |
| Altitude | agl single value : 0 |
| Environment | |
| Light | Daylight |
| Aircraft 1 | |
| Operator | common carrier : air carrier |
| Make Model Name | B757 Undifferentiated or Other Model |
| Flight Phase | ground : parked ground : takeoff roll |
| Flight Plan | IFR |
| Person 1 | |
| Affiliation | company : air carrier |
| Function | flight crew : captain oversight : pic |
| Qualification | pilot : atp pilot : flight engineer |
| Experience | flight time last 90 days : 160 flight time total : 18400 flight time type : 2100 |
| ASRS Report | 520100 |
| Events | |
| Anomaly | maintenance problem : improper documentation maintenance problem : non compliance with mel non adherence : far non adherence : published procedure |
| Resolutory Action | none taken : anomaly accepted |
| Consequence | other |
| Supplementary | |
| Problem Areas | Company Flight Crew Human Performance Aircraft |
| Primary Problem | Flight Crew Human Performance |
Narrative:
I flew air carrier Y from lax to ZZZ to dca on aug/sat/01. The aircraft had an MEL deferral on the left efi/symbol generator. The MEL required a maintenance verification and signoff (follow-up action required) once each flight day. I arrived in ZZZ at XA15Z. A mechanic looked at the logbook in ZZZ and stated that the follow-up action requiring logbook signoff was good for the next flight. I departed ZZZ, for dca at XB25Z. Upon arriving dca, I discovered that a flight day is based on zulu time. I believe that the aircraft should have had an additional verification/signoff prior to departing ZZZ. Thus far, I have not been able to get a definitive answer from our maintenance department. Additionally, I discovered in dca that the previous follow-up action requiring verification/signoff did not contain the mechanic's signature.
Original NASA ASRS Text
Title: B757 FLT CREW OPERATES THE ACFT WITH IMPROPER MAINT DOCUMENTATION WITH REGARD TO THE DAILY MAINT INSPECTION ENRTE TO DCA.
Narrative: I FLEW ACR Y FROM LAX TO ZZZ TO DCA ON AUG/SAT/01. THE ACFT HAD AN MEL DEFERRAL ON THE L EFI/SYMBOL GENERATOR. THE MEL REQUIRED A MAINT VERIFICATION AND SIGNOFF (FOLLOW-UP ACTION REQUIRED) ONCE EACH FLT DAY. I ARRIVED IN ZZZ AT XA15Z. A MECH LOOKED AT THE LOGBOOK IN ZZZ AND STATED THAT THE FOLLOW-UP ACTION REQUIRING LOGBOOK SIGNOFF WAS GOOD FOR THE NEXT FLT. I DEPARTED ZZZ, FOR DCA AT XB25Z. UPON ARRIVING DCA, I DISCOVERED THAT A FLT DAY IS BASED ON ZULU TIME. I BELIEVE THAT THE ACFT SHOULD HAVE HAD AN ADDITIONAL VERIFICATION/SIGNOFF PRIOR TO DEPARTING ZZZ. THUS FAR, I HAVE NOT BEEN ABLE TO GET A DEFINITIVE ANSWER FROM OUR MAINT DEPT. ADDITIONALLY, I DISCOVERED IN DCA THAT THE PREVIOUS FOLLOW-UP ACTION REQUIRING VERIFICATION/SIGNOFF DID NOT CONTAIN THE MECH'S SIGNATURE.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.