![]() |
37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
| Attributes | |
| ACN | 454600 |
| Time | |
| Date | 199911 |
| Day | Tue |
| Local Time Of Day | 1201 To 1800 |
| Place | |
| Locale Reference | atc facility : zid.artcc |
| State Reference | IN |
| Altitude | msl single value : 35000 |
| Environment | |
| Flight Conditions | VMC |
| Light | Daylight |
| Aircraft 1 | |
| Controlling Facilities | artcc : zid.artcc |
| Operator | common carrier : air carrier |
| Make Model Name | MD-11 |
| Operating Under FAR Part | Part 121 |
| Navigation In Use | other |
| Flight Phase | cruise : level |
| Route In Use | enroute : direct |
| Flight Plan | IFR |
| Person 1 | |
| Affiliation | company : air carrier |
| Function | flight crew : captain oversight : pic |
| Qualification | pilot : atp pilot : flight engineer |
| Experience | flight time last 90 days : 10 flight time total : 5000 flight time type : 1100 |
| ASRS Report | 454600 |
| Person 2 | |
| Affiliation | company : air carrier |
| Function | flight crew : first officer |
| Qualification | pilot : commercial pilot : instrument pilot : multi engine |
| Events | |
| Anomaly | non adherence : clearance other spatial deviation |
| Independent Detector | other controllera |
| Resolutory Action | controller : issued alert flight crew : returned to original clearance |
| Supplementary | |
| Problem Areas | FAA Flight Crew Human Performance |
| Primary Problem | Flight Crew Human Performance |
| Air Traffic Incident | Pilot Deviation |
Narrative:
Flight was from ind-sjc. Part of filed/cleared routing was: pawnee city (pwe), hayes center (hct), delta (dte). Prior to pwe, center cleared me direct 'hayes.' I read back 'direct hayes' and proceeded direct hct. Found out later that center meant hays (hys). My fault for assuming he meant hayes center when he said 'hays.' I heard what I wanted to hear since it was in my flight plan. This must happen a lot with 2 vors with similar names being only 116 NM apart.
Original NASA ASRS Text
Title: MD11 CREW HAD TRACK DEV.
Narrative: FLT WAS FROM IND-SJC. PART OF FILED/CLRED ROUTING WAS: PAWNEE CITY (PWE), HAYES CTR (HCT), DELTA (DTE). PRIOR TO PWE, CTR CLRED ME DIRECT 'HAYES.' I READ BACK 'DIRECT HAYES' AND PROCEEDED DIRECT HCT. FOUND OUT LATER THAT CTR MEANT HAYS (HYS). MY FAULT FOR ASSUMING HE MEANT HAYES CTR WHEN HE SAID 'HAYS.' I HEARD WHAT I WANTED TO HEAR SINCE IT WAS IN MY FLT PLAN. THIS MUST HAPPEN A LOT WITH 2 VORS WITH SIMILAR NAMES BEING ONLY 116 NM APART.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.