![]()  | 
            37000 Feet | Browse and search NASA's Aviation Safety Reporting System  | 
            
                
  | 
        
| Attributes | |
| ACN | 249165 | 
| Time | |
| Date | 199308 | 
| Day | Thu | 
| Local Time Of Day | 1201 To 1800 | 
| Place | |
| Locale Reference | airport : bur | 
| State Reference | CA | 
| Altitude | agl bound lower : 0 agl bound upper : 0  | 
| Environment | |
| Flight Conditions | VMC | 
| Light | Daylight | 
| Aircraft 1 | |
| Operator | general aviation : corporate | 
| Make Model Name | Medium Transport, Low Wing, 2 Turbojet Eng | 
| Navigation In Use | Other  Other  | 
| Flight Phase | ground other : taxi | 
| Flight Plan | None | 
| Person 1 | |
| Affiliation | Other | 
| Function | flight crew : single pilot | 
| Qualification | pilot : cfi pilot : atp  | 
| Experience | flight time last 90 days : 60 flight time total : 12000 flight time type : 25  | 
| ASRS Report | 249165 | 
| Person 2 | |
| Affiliation | Other | 
| Function | oversight : supervisor | 
| Events | |
| Anomaly | non adherence : published procedure other anomaly other  | 
| Independent Detector | other flight crewa other other : unspecified  | 
| Resolutory Action | none taken : anomaly accepted | 
| Consequence | Other | 
| Supplementary | |
| Primary Problem | Flight Crew Human Performance | 
| Air Traffic Incident | Pilot Deviation | 
Narrative:
I am a contract pilot for a jet charter company. Upon return to home base at burbank, ca, I was directed by a company vice president and maintenance personnel to taxi their new mdt into their hangar bay. 1 main engine and APU were running. Evaluations: 1) I allowed pressure of a new employer to compromise safety of my aircraft and those inside the hangar. 2) I relinquished my command to individuals outside the aircraft because they did not want to take time to tow the aircraft. Corrective action: it will never happen again in my career. Management has been so informed.
Original NASA ASRS Text
Title: A CPR MDT PLT REGRETS THAT HE TAXIED INTO A HANGAR.
Narrative: I AM A CONTRACT PLT FOR A JET CHARTER COMPANY. UPON RETURN TO HOME BASE AT BURBANK, CA, I WAS DIRECTED BY A COMPANY VICE PRESIDENT AND MAINT PERSONNEL TO TAXI THEIR NEW MDT INTO THEIR HANGAR BAY. 1 MAIN ENG AND APU WERE RUNNING. EVALUATIONS: 1) I ALLOWED PRESSURE OF A NEW EMPLOYER TO COMPROMISE SAFETY OF MY ACFT AND THOSE INSIDE THE HANGAR. 2) I RELINQUISHED MY COMMAND TO INDIVIDUALS OUTSIDE THE ACFT BECAUSE THEY DID NOT WANT TO TAKE TIME TO TOW THE ACFT. CORRECTIVE ACTION: IT WILL NEVER HAPPEN AGAIN IN MY CAREER. MGMNT HAS BEEN SO INFORMED.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.