![]() |
37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
| Attributes | |
| ACN | 189772 |
| Time | |
| Date | 199109 |
| Day | Fri |
| Local Time Of Day | 1201 To 1800 |
| Place | |
| Locale Reference | airport : act |
| State Reference | TX |
| Altitude | msl bound lower : 2500 msl bound upper : 2500 |
| Environment | |
| Flight Conditions | VMC |
| Light | Daylight |
| Aircraft 1 | |
| Controlling Facilities | tracon : act tower : msp |
| Operator | common carrier : air carrier |
| Make Model Name | Light Transport |
| Flight Phase | climbout : takeoff ground : preflight |
| Flight Plan | IFR |
| Person 1 | |
| Affiliation | company : air carrier |
| Function | flight crew : captain oversight : pic |
| Qualification | pilot : atp pilot : commercial pilot : instrument |
| Experience | flight time last 90 days : 250 flight time total : 6400 flight time type : 3250 |
| ASRS Report | 189772 |
| Person 2 | |
| Affiliation | company : air carrier |
| Function | flight crew : first officer |
| Qualification | pilot : instrument pilot : commercial |
| Events | |
| Anomaly | aircraft equipment problem : critical non adherence : published procedure non adherence : far |
| Independent Detector | other other : unspecified |
| Resolutory Action | none taken : anomaly accepted none taken : detected after the fact |
| Consequence | Other |
| Supplementary | |
| Primary Problem | Airport |
| Air Traffic Incident | Pilot Deviation |
Narrative:
On the descent into waco, a passenger passed up a note that stated screws were missing from a chin cowling on the left engine. Upon completion of the flight, I examined the engine and found 14 screws missing from said cowling. I wrote the problem up in the aircraft logbook and promptly grounded the plane. Maintenance arrived 3 hours later and replaced missing screws. The problem could have been avoided if the first officer had done a proper and thorough preflight.
Original NASA ASRS Text
Title: PASSENGER ENRTE TO ACT RPTED SCREWS MISSING FROM L ENG CHIN COWL.
Narrative: ON THE DSCNT INTO WACO, A PASSENGER PASSED UP A NOTE THAT STATED SCREWS WERE MISSING FROM A CHIN COWLING ON THE L ENG. UPON COMPLETION OF THE FLT, I EXAMINED THE ENG AND FOUND 14 SCREWS MISSING FROM SAID COWLING. I WROTE THE PROBLEM UP IN THE ACFT LOGBOOK AND PROMPTLY GNDED THE PLANE. MAINT ARRIVED 3 HRS LATER AND REPLACED MISSING SCREWS. THE PROBLEM COULD HAVE BEEN AVOIDED IF THE FO HAD DONE A PROPER AND THOROUGH PREFLT.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.