![]() |
37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
| Attributes | |
| ACN | 1726206 |
| Time | |
| Date | 202002 |
| Place | |
| Locale Reference | ZZZ.Airport |
| State Reference | US |
| Environment | |
| Flight Conditions | VMC |
| Light | Daylight |
| Aircraft 1 | |
| Make Model Name | A319 |
| Operating Under FAR Part | Part 121 |
| Flight Phase | Cruise |
| Flight Plan | IFR |
| Component | |
| Aircraft Component | Air Conditioning and Pressurization Pack |
| Person 1 | |
| Function | First Officer Pilot Not Flying |
| Qualification | Flight Crew Air Transport Pilot (ATP) Flight Crew Multiengine Flight Crew Instrument |
| Experience | Flight Crew Last 90 Days 98 Flight Crew Total 8803 |
| Events | |
| Anomaly | Aircraft Equipment Problem Critical |
Narrative:
We had an early morning showtime in ZZZ of xa:45am. There was one pack inoperative on our aircraft. There was previous overnight snow; low visibility; deice required; involved mountain airport departure and eo (engine out) procedure; so there was added workload for departure. On climbout through FL220; the remaining pack did not maintain pressurization; the cabin was climbing slowly through 10;000 ft. We slowed the climb; then eventually descended to get the cabin altitude lower; but still could not control the cabin pressurization. The captain [requested priority handling] with ATC; and we made an emergency descent and diverted into ZZZ1. After almost 5 hours on the ground; maintenance fixed the aircraft and we departed to ZZZ2. We received notices from the crew desk that they wanted to re-assign us to fly another flight upon arrival in ZZZ2. This would have taken us within an hour of our [duty time]; and would have extended our duty day to over 12+ hours. I declined the re-assignment and declared fatigued upon arrival in ZZZ2.
Original NASA ASRS Text
Title: A319 First Officer reported diverting due to the aircraft's inability to maintain cabin pressure.
Narrative: We had an early morning showtime in ZZZ of XA:45am. There was one pack inoperative on our aircraft. There was previous overnight snow; low visibility; deice required; involved mountain airport departure and EO (Engine Out) procedure; so there was added workload for departure. On climbout through FL220; the remaining pack did not maintain pressurization; the cabin was climbing slowly through 10;000 ft. We slowed the climb; then eventually descended to get the cabin altitude lower; but still could not control the cabin pressurization. The Captain [requested priority handling] with ATC; and we made an emergency descent and diverted into ZZZ1. After almost 5 hours on the ground; maintenance fixed the aircraft and we departed to ZZZ2. We received notices from the crew desk that they wanted to re-assign us to fly another flight upon arrival in ZZZ2. This would have taken us within an hour of our [duty time]; and would have extended our duty day to over 12+ hours. I declined the re-assignment and declared fatigued upon arrival in ZZZ2.
Data retrieved from NASA's ASRS site and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.