Narrative:

Inbound to ont from chino a touch and go was requested and I thought that that was approved with instructions to report left base for runway 26L. On downwind while instructing the student that was with me I thought that the tower told us to go. Upon executing the touch and go the tower asked what we were doing. We informed them that we were doing a touch and go. The controller said that we had been cleared to land. The student who was operating the aircraft is japanese and his accent may not have been understood by the controller. Also, the greater attention should have been paid by us to the controller. We should not have assumed anything and should have asked for clarification if we were unsure.

Google
 

Original NASA ASRS Text

Title: SMA ON TRAINING FLT MAKES TOUCH AND GO AFTER BEING CLEARED TO LAND.

Narrative: INBND TO ONT FROM CHINO A TOUCH AND GO WAS REQUESTED AND I THOUGHT THAT THAT WAS APPROVED WITH INSTRUCTIONS TO RPT L BASE FOR RWY 26L. ON DOWNWIND WHILE INSTRUCTING THE STUDENT THAT WAS WITH ME I THOUGHT THAT THE TWR TOLD US TO GO. UPON EXECUTING THE TOUCH AND GO THE TWR ASKED WHAT WE WERE DOING. WE INFORMED THEM THAT WE WERE DOING A TOUCH AND GO. THE CTLR SAID THAT WE HAD BEEN CLRED TO LAND. THE STUDENT WHO WAS OPERATING THE ACFT IS JAPANESE AND HIS ACCENT MAY NOT HAVE BEEN UNDERSTOOD BY THE CTLR. ALSO, THE GREATER ATTN SHOULD HAVE BEEN PAID BY US TO THE CTLR. WE SHOULD NOT HAVE ASSUMED ANYTHING AND SHOULD HAVE ASKED FOR CLARIFICATION IF WE WERE UNSURE.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.